[1] The water with the canal needs to be supplied from an external source, like streams or reservoirs. In which the new waterway must improve elevation engineering works like locks, lifts or elevators are built to raise and lower vessels. Illustrations include canals that connect valleys over a higher body of land, like Canal du Midi, Canal de Bria… Read More